Cauchos Castilla has carried out the installation of solar panels for self-consumption with 280 kW inverters with a total investment of 239,607 € as part of the recovery, transformation and resilience plan financed by the European Union
New Photovoltaic Solar Installation at Cauchos Castilla
by Cauchos Castilla | 31 Mar, 2023 | Uncategorized | 0 comments